Basic Training For Oil And Chemical Tanker Cargo Operations (OCTCO)

1 / 25

On tankers, the crude oil washing check list states (amongst other things) that during crude oil washing operations _____

2 / 25

Which of the valves listed should be used either in the fully opened or the fully closed position?

3 / 25

Steam heating coils are provided in some cargo tanks in order to _____

4 / 25

A swing check valve is used in a pipeline to _____

5 / 25

The three basic parts of any eductor are the nozzle, the suction chamber and the _____

6 / 25

When loading by gravity, the last valve to be opened should be _____

7 / 25

What types of deck seal units are there?

8 / 25

Clean ballast may be discharged _____

9 / 25

Which of these conditions can lead to cavitation in a centrifugal pump?

10 / 25

Compared to globe and angle valves, gate valves _____

11 / 25

The handle of a butterfly valve must be _____

12 / 25

In the vicinity of an electrical storm tank cleaning _____

13 / 25

What is the name of the device used for supervising all the ballast water to be pumped overboard?

14 / 25

Clean ballast is normally _____

15 / 25

When there are two slop tanks on board, what are the correct names of these slop tanks?

16 / 25

What is the main quencher for an oil tanker?

17 / 25

If a centrifugal pump operating with a positive suction head becomes air bound, your FIRST response should be to _____

18 / 25

When starting a positive displacement pump, the discharge valve must be _____

19 / 25

On tank vessels, which of these valve types is most commonly used in conjunction with hydraulically actuated controls?

20 / 25

One of the requirements for crude oil washing on tankers is that an inert gas system be fitted. According to regulations an inert gas system is required for which spaces?

21 / 25

Which of these valves will be cycled from fully open to fully closed when the handle is turned 90° ?

22 / 25

The purpose of remotely controlled measuring of tank levels are to measure:

23 / 25

Inert gas is produced on board of ships by _____

24 / 25

Loading through the pump room is _____

25 / 25

What kind of fixed extinguishing plant is installed to use on an oil tanker?

Your score is

Scroll to Top